Nozzle Purge
Before servicing WAZER always make sure the High-Pressure System is purged.
If WAZER was shut down or turned off before completing a cut, the system is still under high pressure. Purge the high-pressure system by properly ending/completing a cut or performing a Nozzle Purge.
Perform a Nozzle Purge by navigating on the WAZER Control Panel to Setup & Maintenance > Maintenance > Nozzle Purge.